Beerwah Health Hub: How a 15-Year Childcare Pre-Commitment Filled the Upper Level
The floor above a GP clinic is hard space to lease. At Beerwah Health Hub, Happy Hearts signed a 15-year childcare lease over 1,470 sqm before the building was finished.
Happy Hearts Childcare & Kindergarten committed to a 15-year lease over the 1,470 sqm upper level of Beerwah Health Hub, at 8–12 Turner Street, Beerwah, while the building was still in development. RWC Medical put the operator forward and negotiated the childcare pre-commitment for the developer, as reported by Commo in August 2024. The centre opened on 5 August 2024, and within weeks most of its rooms were close to full.
What was leased at Beerwah Health Hub?
Beerwah Health Hub is a two-storey, purpose-built medical building on the Sunshine Coast, developed by Cornerstone Group. The medical floor holds GP practice MyLocalDoc, QML Pathology and a café. The level above was the harder question.
RWC Medical's Franz Stapelberg saw the 1,470 sqm tenancy over the medical floor as a childcare site and proposed Happy Hearts for it. The deal that followed:
- Tenant: Happy Hearts Childcare & Kindergarten
- Space: 1,470 sqm on the upper level
- Term: 15 years
- Use: a 105-place childcare centre
- Timing: signed during the development phase, before construction finished
"With notable tenants such as MyLocalDoc, QML Pathology, and a café already in place, the building's potential was evident," Mr Stapelberg told Commo.
What is a pre-commitment lease in a medical development?
A pre-commitment is an agreement to lease signed before the building is complete, sometimes before the builder starts. The tenant secures a site and a say in the design. The developer secures income.
That income counts most at the start. Lenders and valuers judge a development on the leases already signed, so a long lease over a full floor carries real weight. When work began at Beerwah in March 2023, Sunshine Coast News reported that about 70 per cent of the space was already committed, with MyLocalDoc taking 500 sqm on the ground floor and Happy Hearts the level above.
"This pre-commitment not only solidified the tenant mix but also ensured the project's success before the completion of construction," Mr Stapelberg said.
RWC Medical's development advisory work starts at this point, before the tenancy plan is fixed. The same approach is on show at the Burpengary health precinct, where the GPs, pharmacy and pathology were committed early.
Why does childcare work in a health hub?
Families with young children are among a GP's most frequent patients. Put a childcare centre above the clinic and the same parents pass the front door twice a day. A vaccination, a check-up or a pathology collection can be done on the walk back to the car.
The landlord gains too:
- Childcare traffic peaks at drop-off and pick-up, while clinic traffic builds through the middle of the day, so one car park serves both.
- Upper floors are usually the slowest space to lease in a suburban medical building. Childcare takes a whole floor in one lease.
- Operators spend heavily on fit-out and approvals, and sign long terms to match.
- Staff in the health tenancies need childcare as well.

Demand in Beerwah was not in doubt. When the hub officially opened, Cornerstone Group director Simon Heazlewood told Sunshine Coast News there was significant pressure on childcare places across the region.
What does an upper-level childcare centre need from the building?
Outdoor play space, and it can't be added later. A centre on an upper level needs its playground on the same level, so the slab, drainage, shade and balustrades have to be designed for children from day one. At Beerwah the first-floor plan included 720 sqm of outdoor playscape, according to Sunshine Coast News.

Queensland's regulator looks closely at these spaces. Its building standards guidance for early childhood services calls for a non-climbable zone and a fence of at least 1.8 m where a play space adjoins a significant drop, and says the availability of direct egress is considered when a service approval is assessed.
A childcare tenant found after completion inherits a floor that was never built for children. That is why the operator belongs at the table during design. The same logic applied at Springwood Health Hub, where the most demanding tenancy in the building, a day hospital, was planned from concept stage.
When did Happy Hearts open at Beerwah Health Hub?
Happy Hearts opened at the hub on 5 August 2024, Glasshouse Country & Maleny News reported. Centre manager Rochelle Seamer told the paper the centre had seven rooms with capacity for 104 children a day, that most rooms were close to fully booked, and that the 2025 waiting list was already full.
The $20 million hub officially opened the same month, with MyLocalDoc moving into larger rooms and doubling its GPs to eight.
For a developer, the lesson from Turner Street is one of sequence. Which tenancy in your scheme needs the building shaped around it? That is the lease to sign first.