Turnkey vs Custom Medical Fit-Out: Costs, Timing and How to Choose
A fitted suite gets a practice open in weeks. A custom build fits the care model for the long term. Current Queensland fit-out costs, build times and the five questions that settle it.
A turnkey tenancy suits a practice that needs to open quickly and keep its capital for staff and equipment. A custom fit-out suits an established operator with a specialised clinical model and a long lease to spread the cost over. That is the short answer to the turnkey vs custom medical fit-out question. The money explains why it matters: the old rule of thumb of $2,000 per square metre for a medical fit-out is now a starting point, not a ceiling, and Brisbane construction prices are still rising.
What is the difference between a turnkey tenancy and a custom medical fit-out?
A turnkey tenancy is handed over with the core clinical infrastructure already in place: consulting rooms, reception, plumbing, joinery and services sized for medical use. The operator brings equipment, IT and staff. Sometimes the landlord builds it for a specific tenant. Sometimes it's a suite a previous practice left behind.
A custom fit-out starts from a bare shell. The tenant designs and builds the space around its own care model, which is where the cost, the approvals and the waiting sit. Leasing healthcare space is not like leasing a standard office. Clinical workflow, infection control, accessibility, services capacity and regulatory compliance all add steps, and each one can move the opening date.
How much does a medical fit-out cost per square metre in Queensland?
Start with ordinary offices. Rider Levett Bucknall's Riders Digest 2026, Queensland edition prices a good-quality, fully partitioned office fit-out in Queensland at $2,250 to $2,950 per m² for an insurance or government tenancy and $2,800 to $4,200 per m² for a legal or financial one (fourth quarter 2025 rates, excluding GST). Those rates include workstations and furniture. They include none of what makes a clinic a clinic: hand basins in every room, sterilisation areas, heavier plumbing and ventilation, lead lining or medical gases.
Medical-specific guides come from fit-out firms and trade directories, not quantity surveyors, so treat them as indicative. They land in a similar band:
- MedicalSearch's clinic fit-out cost guide (updated July 2026) puts most medical clinic fit-outs at $1,500 to $3,000 per m², with a 150 m² GP practice starting from roughly $300,000 and a 300 m² specialist facility able to pass $1.2 million.
- The same guide says equipment takes between 20% and 40% of the total build.
- National fit-out firm Unita quotes $1,500 to $4,000 per m² for most medical fit-outs, with specialist or high-tech facilities above that.
Read together, $2,000 per m² still works as a floor for a general practice or consulting suite. Procedure rooms, imaging and day surgery sit well above it. On the 250 m² the Royal Australian College of General Practitioners (RACGP) suggests for a four-consulting-room practice, that floor is $500,000 before equipment.
The direction is up. RLB forecasts Brisbane tender prices to rise 5.0% in 2026 and 7.0% a year from 2027 to 2029, and expects cost pressure to build across Brisbane, the Gold Coast and Townsville as demand for labour grows. A quote obtained today has a short shelf life.
How long does a medical fit-out take?
Allow three to six months from the start of design to opening day for a custom fit-out in an existing building. MedicalSearch's guide allows 4–8 weeks for design and council permits and 8–16 weeks for construction. Unita says most medical fit-outs take 8–12 weeks on site. Specialised equipment adds its own lead times, and a site that needs a development approval adds more.
New buildings are slower again. The RACGP's guide to deciding on premises says designing, constructing and commissioning a new practice could take 12 months or more. It also flags a trap in the listings: premises advertised as suitable for medical use "STCA" (subject to council approval) are not yet approved, and that approval can be slow and is not guaranteed.
Every one of those weeks is rent paid, or rent-free period used up, without a patient through the door. For many practices the largest fit-out cost is the revenue lost while waiting to open.
Why do many healthcare operators choose a turnkey tenancy?
- Faster opening. A fitted suite cuts the downtime between signing and trading. For a new practice, that is the difference between weeks and months of lost billings.
- Lower upfront capital. Custom fit-outs need heavy early spending, especially where services, fire compliance, acoustics, hydraulic capacity or specialised rooms need upgrading. A fitted suite keeps that capital free for equipment, recruitment and the ramp-up period, which matters most to new and smaller operators.
- A layout already set up for clinical use. Turnkey suites are often configured for common medical requirements. Often is not always, so have the fit-out checked against your own accreditation and infection-control needs before relying on it.
- Predictable planning. With a known cost and handover date, recruitment, equipment orders, marketing and patient onboarding can all be scheduled with confidence.
The trade-offs are real. You inherit someone else's room sizes and patient flow. The services may be near the end of their life. And the lease may make you responsible for removing a fit-out you didn't build, so read the make-good clause before counting the saving.
When is a custom medical fit-out the better choice?
Custom wins when the space has to work harder than a generic suite can.
- A care model with specific needs. Purpose-built layouts let an operator set the consult-to-treatment flow, storage, sterile zones, imaging requirements, acoustics and room sizes, which lifts efficiency and patient throughput.
- Brand and patient experience. A custom environment reflects the practice's positioning and gives patients a consistent experience, which counts in competitive markets.
- An established practice with a long horizon. A stable patient base and a long-term site strategy justify the higher upfront spend, because the cost is spread over more years of better function.
- Room for change. A custom design can allow for new technology, changing clinical workflows and shifting patient expectations, which reduces rework later.
Who pays for a medical fit-out: the tenant or the landlord?
Either, and the split is negotiable. A landlord can contribute cash towards the tenant's fit-out, grant a rent-free period, or build the fit-out itself and recover the cost through a higher rent. All three are lease incentives, and the market quotes them as a percentage of total lease value (the rent payable over the term).
For scale, Knight Frank's Brisbane CBD office report for Q2 2026 puts average prime incentives at 37.5% on a gross basis, and notes that high fit-out costs are limiting any fall. That is a CBD office benchmark, not a medical one. Suburban medical deals are struck case by case, and the incentive depends on the lease term, the tenant's financial strength and how much of the fit-out stays useful to the landlord afterwards.
The RACGP's advice to practice owners is to negotiate both an initial rent-free period and a share of the fit-out cost, and to budget for returning the premises to their original condition at the end of the lease. A landlord-funded fit-out is not free. Check who owns it, who maintains it, what rent it adds and what happens to it if you leave at first expiry.
Turnkey vs custom medical fit-out: how do you decide?
Five questions settle most cases.
- Opening urgency. How quickly do you need to be operational?
- Capital and cashflow. Can the business fund a custom fit-out and still carry the ramp-up?
- Clinical requirements. Do you need specialised rooms, services or equipment that a fitted suite can't support?
- Lease term and site strategy. Are you committing for the long term, or keeping flexibility?
- Location and local demand. Does the catchment support a fast start, or a longer-term, premium-experience play? The guide to choosing a medical practice location covers how to test that.
The fit-out decision sits inside the wider lease, so read it alongside the Queensland medical leasing checklist. RWC Medical's tenant advisory team matches tenancy selection to clinical requirements, budget, approvals pathway and growth plans. One question to put to any landlord offering a fitted suite: what did the fit-out cost per m², and in what year was it built?
For tenants
Find the right premises, on the right terms.
Independent tenant representation for healthcare occupiers: site selection, negotiation, lease strategy. No conflict of interest, no pressure.